EIA, EMP, Executive Summaries and additional downstream studies on proposed Dibang Multipurpose Project (3000 MW)
 
ADDITIONAL STUDY executive summary
Annexure I Cover Page Executive Summary English
Annexure II Cover Page Executive Summary Hindi
CH 1 Introduction
CH 2 Projects Description Executive Summary English
CH 3 Methodlogy Adopted for the Study
CH 4 Water Resources
Separator
CH 6 Prediction of Impacts    
CH 7 Assessment of Environmental Flows    
       
  eia REPORT   EMP REPORT
  MAPS & FIGS   MAPS & FIGS
Layout Map 1.1 Map 3.1
Map 3.1 Map 3.2
Map 3.2 Map 3.3
Map 3.3 Map 3.4
Map 3.4 Map 3.4A
Map 3.5 Map 3.5
Map 3.6 Map 3.6
Map 3.7 Map 3.7
Map 3.7 A Map 3.8
Map 3.7 B Map 3.9
Map 3.9 Map 3.10
Map 6.1 Map 3.11
  REPORTS Map 3.12
Acknowledgements Map 3.13
Annexer 4.1 Map 3.14
Annexer 5.1, 5.2, 5.3 Map 3.15
Annexer 5.4 Map 3.16
Annexer 5.5 Map 3.17
Ch1 Inroduction Map 3.18
Ch2 Methodology Map 3.19
Ch3 Environmental Baseline Status: Physical Aspects Map 3.20
Ch4 Environmental Baseline Status: Ecological Aspects Map 3.21
Ch5 Environmental Baseline Status: Socio-cultural & Economical Aspects Map 3.22
Ch6 Assessment of Impacts Map 3.23
Contents Map 3.24
Cover_EIA Map 9.1
List of Tables, Maps, Figures   REPORTS
Separators Annex 15.1
    Ch1 Introduction
    Ch2 Methodology
    Ch3 Catchment Area Treatment Plan
    Ch 4 Biodiversity Management & Conservation Plan
    Ch 5 Fishery Development Plan
    Ch 6 Greenbelt Development
    Ch 7 Geo-environmental Management Plan
    Ch 8 Muck Disposal Plan
    Ch 9 Restoration of Quarry Sites
    Ch 10 Landscaping & Restoration of Construction Areas
    CH 11 Public Health Delivery system
    Ch 12 Solid Waste Management
    Ch 13 Energy Conservation
    Ch 14 R & R plan
    Ch 15 Disaster Management Plan
    Ch 16 Maintenance of Air, Noise & Water Quality
    Ch 17 Env Monitoring Programme
    Contents
    Cover EMP
    List of tables, map, fig
    Separators
    Summary of Cost Estimate