EIA, emp, executive summary of eia, social impact assessment, down stream study reports pertaining to lower Siang hydroelectric project (2700 mw)
 
Downstream Impact Assessment report Executive Summary
CHAPTER-1-Introduction CONTENTS
CHAPTER-2- Project Desription Cover Summary
CHAPTER-3 Hydrology Fig-1
Chapter-4 Terrestrial Ecology Fig-2
Chapter-5 Aquatic Ecology Fig-3
Chapter-6 Socio-economic aspects Fig-4
Chapter-7 Prediction of Impacts Fig-5
Chapter-8 Assessment of Environmental Flows Fig-6
Fig-7
Contents-LSHEP Executive Summary_LSiang
Cover Page    
CS-6 DISCHARGE 350 M3 Model (1)    
CS-7 DISCHARGE 4932 M3 Model (1)    
Annexure-I _Chapter-1    
Fig. 2.1    
070411 Fig 6.1 Inundation_Map_A3 (DIA)    
Fig. 7.1    
       
EIA Report EMP Report
  ANNEXURE   ANNEXURE
ANNEXURE-A Chapter-1 Annexure-I
Annexures-I-Chapter-1 Annexure-III
Annexure-I_IV Annexures-II a,b,c,d,e Final
Annexure-V    
  CHAPTER   CHAPTER
Bibliography Ch1 BIODIVERSITY MANAGEMENT
Ch 1- INTRODUCTION Ch2 CAT Plan
Ch 2- CONCEPT & METHODOLOGY Ch3 FISHERY DEVELOPMENT
Ch 3 - Physiography Ch4 HEALTH DELIVERY SYSTEM
Ch 4 - Hydrometeorology Ch5 Waste Management
Ch 5 - Soil Ch6 Provision for Fuel and Energy
Ch 6 - Geology & Seismicity Ch7 Relocation & Rehabilitation of Dumping sites
Ch 7 - Land Use and Land cover Ch8 Land Scaping & Resoration
Ch 8 - Florstics & Forest Types Ch9 Green Belt
Ch 9 - FAUNAL ELEMENTS Ch10 R & R Plan
Ch 10 - Aquatic Life Ch11 Disaster Management Plan 1-10-10
Ch 11 - Air Environment Ch12 ENVIRONMENTAL MONITORING
Ch 12 - CONSTRUCTION METHODOLOGY Ch13 SUMMARY OF COST ESTIMATES
Ch 13 - SOCIO-ECONOMIC CONTENTS EMP Report
Ch 14 - IMPACT ASSESSMENT EMP Cover
CONTENT Separators EMP
EIA Cover Table 2.16 Yearwise activities
Separators EIA    
  MAPS   MAPS
Ch4_Figs 11.3 Dam Break Graphs
Ch10_Figs Ch11_Figures
Ch5_Plate 5.1 Fig 2.1 Index map
Ch9_plates Fig 2.2 FCC
Ch10_plates Fig 2.4 YAMNE WATERSHED Drainage
Fig 1.1 Hydro projects Fig 2.5 Simang Watershed Drainage_f
Fig 1.2 Location Map Fig 2.6 Drainage SiyomiF
Fig 6.4 Fig 2.7 Drainage Siang
Fig Chapter 14 Fig 2.8 Slope
Fig.1.3 Layout final Fig 2.9 Simang Watershed Slope
Fig.2.1 Sampling Sites Fig 2.10 Siang Watershed Slope
Fig.3.1 Drainage Indo Tibet Fig 2.11 Siyom Watershed Slope
Fig.3.2 Drainage Catchment Boundary Fig 2.12 Yamne Watershed Slope
Fig.3.5 Relief Catchment Boundary Fig 2.13 SOIL FREE DRAINING F
Fig.3.6-3D Fig 2.14 Simang Watershed Soil
Fig.3.7 Slope Catchment Boundary Fig 2.15 Siang Watershed Soil
Fig.3.8 Aspect Catchment Boundary Fig 2.16 Siyom-watershed Soil
Fig.5.1 Soil Map Catchment Boundary Fig 2.17 Yamne watershed soil
Fig.5.2 Soil 10km Fig 2.18 Soil Depth FD
Fig.6.1 Regional Geology Fig 2.19 Siang-watershed Soil-Depth
Fig.6.2 Seismic zoning Fig 2.20 Simang-watershed Soil-Depth
Fig.6.3 Seismotectonic Fig 2.21 Siyom-watershed Soil-Depth
Fig.7.1 FCC Catchment Boundary Fig 2.22 yamne watershed soil depth
Fig.7.3 Luse_Submergence Area Fig 2.23 Landuse FD1
Fig.14.1 Impacts bar Fig 2.24 siang watershed landuse
Fig7.2 Fig 2.25 simang watershed landuse1
Figs 3.3 & 3.4 Fig 2.26 Siyom watershed landuse
Hardcopy Fig 2.27 YAMNE WATERSHED LANDUSE1
Plot Fig 2.28 Erosion FD
    Fig 2.29 simang watershed Erosion
SIA REPORT Fig 2.30 siang watershed Erosion
CONTENTS Fig 2.31 Siyom-watershed Erosion
Cover-SIA Fig 2.32 YAMNE WATERSHED Erosion1
Map showing inundation area of proposed LSHEP Fig 2.33 Treatment FD
SIA Report Fig 2.34 Yearwise Index-map
    Fig 9.1 Green Belt
List of Accredited Consultants June11 Fig 9.2 Landslides Reservoir
    Fig 11.13 Inundation Map A3
CISHME CERT Fig 2.3
    Fig 7.1-7.2
    Fig 7.3-7.4
    Fig 7.5-7.6
    Plate 11.1 - 11.3 Dam Break Graphs